Articles
EVMS Podcast - Episode 1 - Wayne Abba
On this episode of the EVMS Podcast, I sit down with Wayne Abba – the architect of modern Earned Value Management reform and one of the most respected voices in the field.
From a small town in Michigan to the Pentagon, Wayne helped retire C/SCSC, shape EIA-748, advise allies and civilian agencies, and influence how GAO and OMB think about cost, schedule, and risk. He also shares what really happened on programs like the A-12, Super Hornet, and Seawolf – and why some teams used EVM to save their program while others ignored the data.
If you care about EVMS, project controls, or major defense and research programs, this is a rare, unfiltered conversation with someone who’s seen it all.
🔥 Surviving the Shift: What EIA-748 Rev E, DECM/IPMDAR, and FAR/DFARS Changes Really Mean for Project Controls🔥
Surviving the Shift: What EIA-748 Rev E, DECM/IPMDAR, and FAR/DFARS Changes Really Mean for Project Controls
Deltek ProjectCon 2025
🔹 Deltek ProjectCon 2025 — Denver, CO — November 10-12, 2025 🔹
Karlo F. Menoscal, EVP, PMP will be presenting:
🧭 PPM-08: Surviving the Shift — Adapting Project Controls to EIA-748 and FAR Evolution
📊 Control Account Manager Training: The Backbone of EVMS Success
EVMS CAM Training - Control Account Manager Training: The Backbone of EVMS Success
🧩 The Work Breakdown Structure: Foundation of EVMS and Program Success
The Work Breakdown Structure: Foundation of EVMS and Program Success
EVMS vs. Project Controls: What Every Government Contractor Should Know
EVMS vs. Project Controls: What Every Government Contractor Should Know
⚡ Directed Energy Weapons in Missile Defense: Hype, Reality, and Who’s Actually Delivering ⚡
Directed Energy Weapons in Missile Defense: Hype, Reality, and Who’s Actually Delivering
Deltek and Elixir Value Management Systems Partnership
Deltek and Elixir Value Management Systems Partnership
🚩 Subcontractor EVMS Flowdown: The Pitfalls No One Talks About
Subcontractor EVMS Flowdown Pitfalls
📊 Implementing Deltek Cobra: Timeline Expectations and Key Factors
Implementing Deltek Cobra: Timeline Expectations and Key Factors
🎥 Introducing Elixir Value Management Systems, Inc. on YouTube 🚀
Elixir Value Management Systems’ YouTube Channel
🤔 The Earned Value Technique (EVT) Decision Tree 🔥
The Earned Value Technique (EVT) Decision Tree
🔗 Cost and Schedule Integration in EVMS: The Backbone of Program Performance
🔗 Cost and Schedule Integration in EVMS: The Backbone of Program Performance
🔥 TEKEVER: The European ISR Powerhouse Scaling Beyond the Battlefield 🔥
TEKEVER: The European ISR Powerhouse Scaling Beyond the Battlefield
🧠 QBD: The Backbone of a Credible Earned Value Management System
QBD: The Backbone of Credible Earned Value Management
🔥 Estimated Actuals in EVMS - Bridge the Gap Between Cost Incurred and Cost Recorded 🚀
🔥 Estimated Actuals in EVMS - Bridge the Gap Between Cost Incurred and Cost Recorded 🚀
🚩 5 EVMS Red Flags That Spell Trouble—And How to Fix Them
🚩 5 EVMS Red Flags That Spell Trouble—And How to Fix Them
Misconception Alert: Buying EVMS Tools ≠ Having an EVMS
Misconception Alert: Buying EVMS Tools ≠ Having an EVMS

